b'INSTALLING SANFOOT / SHORT FORMINSTRUCTIONSThe installation process is critical to the aesthetic appeal andPRIMER:acceptance of SanFoot.Surface preparation, adhesive and primer Bulls Eye 1-2-3 Primer Sealer from Zinsserselection, environmental condition, and quality workmanship are(wood substrates, MDF, plywood, etc.)the key elements for a successful installation.SanFoot comes from the factory prefinished with urethane sealer and finish.Gardz High Performance Sealer from Zinsser INSPECTION OF PRODUCT: (new and existing/damaged drywall)Please inspect for damage before signing receipt of product from.PRO 935 (formerly R 35) from Roman (new drywall)If damage is noted, please advise the freight carrier immediately PRO 977 Ultra Prime Pigmented Primer from Roman when signing for the product from the freight carrier.Examine(new and painted drywall)all sheets of SanFoot Natural Wood Veneer Wallcovering uponADHESIVES:receipt for quality and compliance with the approved specification (the sheets ordered should match the architect/interior designers Roman 111 Extra Strength Clay Adhesive submittal) before storing or starting installations.Any shortage of(formally Gardner Gibson 111)material must be reported within 3 days after receipt of material. Roman 555 Extreme Tack Wallcovering Adhesive The installation contractor must verify that the correct specified(formally Roman VOV) species of wallcovering is present on the job site. *NOTE: This adhesive may be difficult to remove if left on theSTORAGE: face of material. SanFoot should be kept in the manufacturers packaging until 24 Roman 774 Clay Strippable -apply adhesive at full strength. to 48 hours before installation.Store in a clean, dry, secure areaDo not dilute. that has low humidity and a stable temperature range of 45 to 85APPLY ADHESIVES:Fahrenheit. Prepare drywall surface (new drywall).Three (3) sheets should be ENVIRONMENTAL CONDITIONS PER PRODUCT: installed.APPLY ADHESIVES AT FULL STRENGTHwhip or stir to thin to Areas to receive SanFoot should be environmentally controlled bydesired consistency.DO NOT DILUTE ADHESIVE WITH WATER!!the HVAC system.Maintain a temperature range of 45F to 85F,TEST AREA APPROVAL:with no more than 50% relative humidity.At no additional cost to the owner, the Wallcovering Installation PREPARATION OF SANFOOT: Contractor shall install no less than three (3) full-width sheets, of each Remove SanFoot sheets from the box and allow the sheets topattern specified in an area designated by the Architect, Designer or relax and acclimate to the environment for 24 to 48 hours.IfOwner.The test installation area shall be reviewed to conform to the the air is dry, or if the sheets must remain out of the box for anmanufacturers standard installation instructions and recommended extended period, cover with a sheet of vinyl to prevent the veneeradhesives.Only the Architect, Designer or Owner shall approve the test from drying out.It is best to lay the sheets face down, during thisinstallation.The Contractor shall replace any unsatisfactory sheets as period, and not directly on the floor. directed by and until the test area is accepted by the Architect, Designer PREPARING DRYWALL SURFACE (NEW DRYWALL): or Owner.All drywall finishing should comply with Association of Wall andUse of an unspecified adhesive, primer or any additional Ceiling Industries-International (AWCI), Painting and Decoratingfinishes will VOID the manufacturers warranty at time of Contractors of America (PDCA) specifications, Level 5 All surfacesinstallation.Future problems that may occur because of shall be clean, smooth, and dry prior to applying primer and theincorrect installation procedures are not the responsibility application of SanFoot. of Jacaranda, Inc., or any of their distributors.Full updated instructions are available by clicking on the QR code below. 0 2 8'