What a SanFoot Installation Needs From the Jobsite

SanFoot arrives from our factory prefinished with a urethane sealer and finish, so much of what shapes the result is settled before the first sheet goes up. Commercial wallcovering installers apply it direct to drywall with standard wallcovering tools, and the jobsite supplies the conditions, the wall, and the approvals that make that work go well.

The requirements below come from our installation guidelines. They apply to any project, large or small, and they follow the order in which the work usually happens.

A Controlled Space and Time to Acclimate

SanFoot needs an HVAC-controlled space, with a temperature between 45 and 85 degrees Fahrenheit and relative humidity no higher than 50 percent. Sheets stay in the manufacturer’s packaging until 24 to 48 hours before installation, stored in a clean, dry, secure area with low humidity and a stable temperature.
Once the sheets come out of the box, they need 24 to 48 hours to relax and acclimate. They should lie face down and off the floor, and if the air is dry, a vinyl sheet over them keeps them from drying out.

A Wall Ready for the Sheets

Drywall must meet AWCI and PDCA specifications for a Level 5 finish, and every surface needs to be clean, smooth, and dry before primer goes on. Our approved primers are matched to the surface, with different options for wood, MDF, and plywood than for new, damaged, or painted drywall.

Adhesive goes on at full strength and is never diluted with water. Using an adhesive, primer, or finish we have not specified voids the manufacturer’s warranty at installation, so the product choices belong in the conversation early.

The Test Area Before Full Installation

Before full installation, no fewer than three full-width sheets per pattern are installed in an area the architect, designer, or owner designates. Only the architect, designer, or owner approves that test installation, which confirms the result on site before the rest of the wall goes up. The requirement is stated per pattern, so a project with more than one pattern needs a test area for each.

Putting the Sequence Together

Taken together, the order of work runs from conditions and storage to acclimation, wall preparation, primer, test area approval, and installation. Each step depends on the one before it, and sharing the project schedule and substrate information with us early lets our guidance match the project.

For guidance on preparing a jobsite for SanFoot, including surface preparation and the approved primers and adhesives for your substrate, contact Jacaranda.